VertiGIS FM will be released on April 16, 2026 with Version 10.14 – featuring new functions and improvements. A complete list of all changes can be found in the changelog at
https://changelogs.vertigis.com
Here is an overview of the most important new features:
Platform
- It is now possible to specify a responsible person for defects.
- In the dashboard configuration, the number format can be specified for key figures of sums and averages.
App
- When starting the app, a notification is displayed if synchronization has not occurred for a long time.
App Maintenance
- When scanning a QR code in the app, only specific assets with associated components or a specific component where the search value matches 100% are displayed.
- The recording of new measures with checklists (according to predefined checklist definitions) is possible in the app for devices and components.
Tree Cadastre
- Documents and photos can be directly attached in the recording form for maintenance measures.
Energy Management
- The recording of supply areas is possible without the Building Management license.
- The representation of two-way meters (consumption and feed-in) is possible. Sensor values for the respective Obis codes are also transferred to the meter and metering point.
- In the product settings, there is a new setting under Energy Management: Automatic Interpolation for Sensor Values.
- This allows missing sensor values to be interpolated during manual or automatic recording.
Building Management
- Measures can be directly recorded and documented for the object 'Window'.
Maintenance
- The defect status "accepted" is available. This allows defects to be classified for which remediation (e.g., due to low severity) is not carried out or whose risk is accepted.
- In the search for measures, filter functions are available to search for measures with checklist items marked "not ok" and "partially ok".
Rental Management
- The 5th MILG (Rental Law Inflation Relief Act) in Austria is supported in the operating cost statement.
Project Management
- The field Organization is available on the project. This allows projects to be restricted via permission management (organization rights).
Condition Assessment
- When recording inspections, configurations for individual types of doors/gates and windows can now be set. This allows the exact types of objects to be inspected to be preset for conducting an inspection.
Comments
0 comments
Article is closed for comments.