GEONIS Sewer System
GEONIS Sewer System
- Customization of Font and Formatting for Standard Manholes
- Correct Missing VSA_VP/NP_REF and from/toHaltungspunktRef
- GEONIS Sewer System Inspection – One single inspection over two pipeline sections
- Formation of Catchment Areas in the Update Module
- Change in Font in SEW
- Status Dialog: Calculate Current Damages > Not Enough Memory
- Connection cannot be created when the node to be created is a basin or a pumping station
- Transfer from GEONIS to MIKE URBAN using Globalid
- SEW net tracking breaks off on entry
- SEW PDE ERROR: table 'AWZR_UNTERHALTUNG' already exists
- SEW ISYBAU export with error messages
- SEW owner and operator: Sort by IDX
- Why does the message "Access violation in module 'GeonisCentral.dll'" appear when editing attributes in the sewer system solution?