[5.38] Keep If activity centered when changing the description
TerminéeIntroduced in VertiGIS Studio Workflow 5.38
In the workflow designer, when I drop an If activity on another existing activity, its location will be centered, below that other activity. This is good.
If I now change the description of the If, it becomes wider, but the left side remains in the same location, so it's no longer centered.
Can something be done about this behavior?
1
-
Please! I know to just place that activity by its corner in the designer UI, but I rarely actually do it. Pavlov would be concerned at this point, I think.
1
Vous devez vous connecter pour laisser un commentaire.
Commentaires
1 commentaire