listen to MapExtentChangedEvent in workflow html5 viewer
Hi,
I made a workflow that gets the map extent and uses it to form a url to a external viewer. The url is part of a list of urls that are displayed in a form. Once clicked another viewer will be opened with the same extent. This all work well. But once the workflow is opened the form is displayed in the right-hand-side container of the viewer. It is still possible to change the extent of the map. I want to dynamically update my url. I tried to do this following this example: http://support.geocortex.com/use-workflow-to-listen-and-react-to-viewer-events. I included a ListenForExternalEvent (MapExtentChangedEvent) and a CollectExternalEventArgs for this event. If I place this event listener in the workflow before I built the form it works but waits for the extent to change before it displayes the form. If I use a flowchart and place the event listener after I built the form and point back to the form that was built it never fires. The form seems to be the end-station of the workflow. I do not want to include a button saying "Click here if you changed the extent", of course. Any ideas on how to make this work?
Best, Tjibbe
Bitte melden Sie sich an, um einen Kommentar zu hinterlassen.
Kommentare
0 Kommentare